{"id":1709,"date":"2019-02-05T16:05:36","date_gmt":"2019-02-05T21:05:36","guid":{"rendered":"https:\/\/imi.com.pa\/?p=1709"},"modified":"2024-06-20T11:51:08","modified_gmt":"2024-06-20T16:51:08","slug":"vopak-panama-terminal-expansion-marine-works-blm1a","status":"publish","type":"post","link":"https:\/\/imi.com.pa\/en\/vopak-panama-terminal-expansion-marine-works-blm1a\/","title":{"rendered":"VOPAK &#8211; Panama Terminal Expansion &#8211; Marine Works BLM1A"},"content":{"rendered":"\r\n<p>The project was developed under EPC modality and consisted of the design, supply, and construction of marine facilities for a tank farm located at Bahia Las Minas. The marine terminal is designed to operate with 80,000 DWT and 10,000 DWT vessels, and consists of the following elements:<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>Berthing and mooring structures, required to receive product vessels (Monopile diameters between 2.0 m and 2.5 m with weights of up to 102 tons)<\/li>\r\n<li>A Loading platform, required for the support of loading equipment including power packs, gangway systems, and piping.<\/li>\r\n<li>A 175m approach trestle, required for the support of product and utility lines between ship and shore and access for pedestrians and man pulled trolleys to the loading platform.<\/li>\r\n<li>Supply and installation of marine equipment (quick release hooks, fenders, bollards and navigation lights).<\/li>\r\n<li>Supply and installation of the cathodic protection system.<\/li>\r\n<\/ul>\r\n","protected":false},"excerpt":{"rendered":"<p>The project was developed under EPC modality and consisted of the design, supply, and construction of marine facilities for a tank farm located at Bahia Las Minas. The marine terminal is designed to operate with 80,000 DWT and 10,000 DWT vessels, and consists of the following elements: Berthing and mooring structures, required to receive product [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[45,26],"tags":[],"class_list":["post-1709","post","type-post","status-publish","format-standard","hentry","category-oil-gas-terminals-and-power-plants","category-imi-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/posts\/1709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/comments?post=1709"}],"version-history":[{"count":7,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/posts\/1709\/revisions"}],"predecessor-version":[{"id":3161,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/posts\/1709\/revisions\/3161"}],"wp:attachment":[{"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/media?parent=1709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/categories?post=1709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imi.com.pa\/en\/wp-json\/wp\/v2\/tags?post=1709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}