ACP – Installing Dolos Breakwater in Cristobal

Client: Panama Canal Authority
2016

Panama Canal Authority , installation of idols on the breakwater (west side) , Christopher

DIPA – Removal of structures and debris of the ACP Oil Crib

Kanan Overseas – Dock System for Energy Barges

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

IMI | Intercoastal Marine Inc.