2016
Vinci Construction Grands Projects, the project consisted in the design and construction of two temporary docks, one on each side of the Panama Canal waterway. One dock was supported over piles and prefabricated structures, and the dock on the west side was made in an “L” shaped configuration composed of sheet piles and controlled earthfill.