This project consisted of the installation of 48” diameter Piles and related works, including the supply of Equipment and labour to drive piles with 48″ diameter and length of 25m, as well as the modification of the existing rings to dock a power barge (124 MW), and the manufacture of the new sliding structures, sandblasting works, piles painting, driving works, and tugboat maneuvers for the entry and positioning of the new power barge.