2016
The project was developed by IMI under an EPC modality to receive cruise vessels with a length of 339 m. The port infrastructure entailed the construction of a berthing face 201 m in length and 20 m wide. Prefabricated/prestressed concrete piles were used to support the concrete superstructure.