DIPA – Removal of structures and debris of the ACP Oil Crib

The project consisted of the removal of steel pipe piles filled with concrete on the Pacific side on the east bank of the canal in the area named Oil Crib, Balboa, from an elevation +1.5m to an elevation of -16.7m MLWS.  This was part of a larger project by the Panama Canal Authority to widen the canal access on the Pacific side of the canal.

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

Kanan Overseas – Dock System for Energy Barges

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

DIPA – Dry excavation and dredging works at Agua Clara locks

IMI | Intercoastal Marine Inc.