MIT – ASC CY PHASE I

2016

Manzanillo International Terminal, the project consisted of the construction of the first Automatic Stacking Crane system in Latin America. IMI constructed one kilometer of rails for the port container crane positioning system, fabricated and drove 450 prefabricated concrete piles, and installed the entire electromechanical system which accompanies the system’s superstructure (rails, electrical ducts, drainage systems, among others).

DIPA – Removal of structures and debris of the ACP Oil Crib

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

Kanan Overseas – Dock System for Energy Barges

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

IMI | Intercoastal Marine Inc.