MIT – Beach Landing

Client: Minera Panamá S.A. 2016

Minera Panamá S.A., the project consisted in the development of marine works under an EPC modality in a remote location for the Mina de Cobre Panama project, located in the district of Donoso, Republic of Panama.

The project entailed the design and construction of provisional marine structures for the loading and unloading of shipments of construction equipment and materials for the various areas of the construction of the mine.

The pier was designed to be a multipurpose terminal suitable for the loading and unloading of construction equipment and materials, personnel, fuel, among others.

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

Kanan Overseas – Dock System for Energy Barges

DIPA – Dry excavation and dredging works at Agua Clara locks

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

IMI | Intercoastal Marine Inc.