Power Barge Dock

NICARAGUA

Construction of a finger pier for a pipe rack, a small truck loading area, and access to fuel barge moorings.  Construction of mooring dolphins and pile guides on the side of the owner’s power barge.

Furnish and install sub-sea cooling water discharge HDPE pipeline 30″ in diameter with risers. All materials and equipment were mobilized from Panama. Ocean transport on IMI barges.

DIPA – Removal of structures and debris of the ACP Oil Crib

DIPA – Dry excavation and dredging works at Agua Clara locks

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

Kanan Overseas – Dock System for Energy Barges