TTI – Bunker Fuel Transfer Pier

2016

Telfer Tanks Inc., The project consisted in the development of marine works under an EPC modality located in the Telfer area in the city of Colon, Panama. The works included the construction of a bunker fuel transfer pier suitable for receiving Post Panamax, Panamax, and barge type vessels simultaneously under different configurations.

DIPA – Removal of structures and debris of the ACP Oil Crib

DIPA – Dry excavation and dredging works at Agua Clara locks

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

Kanan Overseas – Dock System for Energy Barges

IMI | Intercoastal Marine Inc.