Vinci – Atlantic Bridge Temporary Docks

2016

Vinci Construction Grands Projects, the project consisted in the design and construction of two temporary docks, one on each side of the Panama Canal waterway. One dock was supported over piles and prefabricated structures, and the dock on the west side was made in an “L” shaped configuration composed of sheet piles and controlled earthfill.

Kanan Overseas – Dock System for Energy Barges

DIPA – Removal of structures and debris of the ACP Oil Crib

DIPA – Dry excavation and dredging works at Agua Clara locks

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

IMI | Intercoastal Marine Inc.