VOPAK PANAMA ATLANTIC, INC
This project consisted of th installation of coastal protection along 190m of shoreline on the east side of the Terminal, between the pier and the construction of the new north Jetty (in execution by IMI). The works consisted of excavation works, the supply, transport and the installation of geotextile and armor rock. This required high quality rock material transferred from quarries on the Pacific coast to the Atlantic coast , city of Colón, Republic of Panama.