VOPAK PANAMA ATLANTIC, INC
The project was developed under EPC modality and consisted of the design, supply, and construction of marine facilities for a tank farm located at Bahia Las Minas. The marine terminal is designed to operate with 80,000 DWT and 10,000 DWT vessels, and consists of the following elements:
In total, over 2,000 tons of steel structural elements were designed, supplied, and installed for this project. The works also involved the fabrication of precast concrete structures and offshore cast-in-place concrete placement works for the Transfer and Loading Platforms. The works were carried out in accordance with the contractual and regional seismic criteria.