VOPAK – Jetty Shoreline Protection Work I & II

VOPAK

This project consisted of the installation of coastal protection on the east side of the Terminal, between the pier
and the construction of the new north Jetty (executed by IMI). The works consisted of excavation works, the supply, transport and the installation of geotextile and armor rock. This required high quality rock material trans-ferred from quarries on the Pacific coast to the Atlantic coast , city of Colón, Republic of Panama.

DIPA – Removal of structures and debris of the ACP Oil Crib

DIPA – Dry excavation and dredging works at Agua Clara locks

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

Kanan Overseas – Dock System for Energy Barges

IMI | Intercoastal Marine Inc.