Chevron – Design and Construction of the South Dock

2016

The Project consists in the design, procurement, and construction for the southern terminal, which includes the driving of a series of mono piles 2m in diameter and with weights in excess of 90 tons each, as well as the construction of the superstructure and installation of the connecting walkways.

DIPA – Dry excavation and dredging works at Agua Clara locks

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

Kanan Overseas – Dock System for Energy Barges

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

IMI | Intercoastal Marine Inc.