Chevron – Design and Construction of the South Dock

2016

The Project consists in the design, procurement, and construction for the southern terminal, which includes the driving of a series of mono piles 2m in diameter and with weights in excess of 90 tons each, as well as the construction of the superstructure and installation of the connecting walkways.

VOPAK – Panama Terminal Expansion – Marine Works BLM1A

MPSA – Jetty Facility

MIT – Berth 8

MPSA – Intake Concrete Caisson

IMI | Intercoastal Marine Inc.