ENERGIA 2000 – Design and construction of an “Early Gas” maritime terminal

Posted on: October 9th, 2025 by 4ewebmaster

The project consisted of the design and construction of an offshore maritime terminal (1.4 km from the coast) for the offloading of high-pressure natural gas (HPNG) for the operation of one of three power plants, located in Montecristi, Dominican Republic.

The maritime facility will allow the berthing of an FSRU. This maritime facility’s design consists of four (4) mooring dolphins, two (2) breasting dolphins and an offloading platform connected to the coast by means of a 1.3 km long concrete-lined subsea pipeline.

Jack-Up platform C-722

Posted on: January 31st, 2025 by 4ewebmaster

Manitowoc 4100 230T

Posted on: January 31st, 2025 by 4ewebmaster

Manitowoc 3900 W

Posted on: January 30th, 2025 by 4ewebmaster

Jack-Up platform C-731

Posted on: January 30th, 2025 by 4ewebmaster

IMI 104

Posted on: January 29th, 2025 by 4ewebmaster

Manitowoc 2250 300T

Posted on: January 29th, 2025 by 4ewebmaster

IMI 105

Posted on: January 28th, 2025 by 4ewebmaster

Link-Belt LS-718 250T

Posted on: January 28th, 2025 by 4ewebmaster

IMI-106

Posted on: January 27th, 2025 by 4ewebmaster
IMI | Intercoastal Marine Inc.