Coastal Petroleum Dominicana – LPG San Pedro de Macorís (República Dominicana) 

2016

The Project consists of the design, procurement, and construction for a mooring and berthing system for LPG transport vessels. IMI is developing this project by applying novel techniques using steel jackets for the construction of the 8 Breasting Dolphins and 9 Mooring Dolphins.

DIPA – Dry excavation and dredging works at Agua Clara locks

Kanan Overseas – Dock System for Energy Barges

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

DIPA – Removal of structures and debris of the ACP Oil Crib

IMI | Intercoastal Marine Inc.