MIT – Barge Slip

Manzanillo port terminal –  Colón, Panama

Manzanillo International Terminal, the works consisted of the construction of a barge slip for barge mounted power plants stationed within Manzanillo International Terminal, located in the city of Colón, Panama. The barge slip consists of a wall of sheet piles running along the perimeter of the slip, and provides a suitable depth for the operation of the barges.

DIPA – Removal of structures and debris of the ACP Oil Crib

VOPAK – Demolition Contract – Bahia Las Minas Phase – 1A

DIPA – Dry excavation and dredging works at Agua Clara locks

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

IMI | Intercoastal Marine Inc.