MPSA – Beach Landing Stage II

Client: Minera Panamá 2016

Minera Panama S.A. The project consisted in the marine transport of high tonnage and oversized cargo, using a diverse set of floating marine equpiment, such as barges of 2,000 ton capacity, tug boats, and RORO type shipments, over a period in excess of three years. The cargo was delivered from different ports located in the area of Colón, Panama, up to the marine facilities in the construction area of Minera Panama in Punta Rincon (a distance of approximately 60 nautica lmiles).

DIPA – Dry excavation and dredging works at Agua Clara locks

WWL ALS – Logistic Cargo Transportation from MIT to Punta Rincon (Mine Trucks)

Kanan Overseas – Dock System for Energy Barges

DIPA – Removal of structures and debris of the ACP Oil Crib