Panama Port Company, The project consisted in the construction of Berth 10, with a length of approximately 220 m of new berthing area and 130 m of repairing and expanding the existing berth.
ENERGIA 2000 – Design and construction of an “Early Gas” maritime terminal
DIPA – Removal of structures and debris of the ACP Oil Crib