MIT – Berth 8

2016

Manzanillo International Terminal, IMI constructed 20,000 m2 of marine infrastructure, with a berth 395 m in length and 42.75 m wide, founded on precast/prestressed piles (381 units with lengths of up to 50 m and weights of up to 50 tons) and steel piles (148 units with 48” diameters, with lengths of up to 47 m and weights of approximately 35 tons each). One third of the pile positions were drilled in the existing seabed (Gatún) before later driving the piles. All equipment used (barges, tugboats, and cranes) are part of IMI’s fleet of equipment.

MIT – Berth 8

2016

Manzanillo International Terminal, IMI realizó la construcción de 20.000 m2 de infraestructura marítima, con un muelle de 395 m de largo y un ancho de 42.75 m, en base a pilotes de hormigón prefabricado/ pretensado (381 unidades con largos de hasta 50m y pesos de 50ton) y pilotes de acero (148 unidades de 48pulg de diámetro), con un largo de pilotes de hasta 47 m y un peso aproximado de 35 ton cada uno. Se considera que un tercio del total de pilotes se perforan en el subsuelo existente (Gatún) para posteriormente efectuar hinca de pilotes. Todas los equipos utilizados (barcazas, remolcadores y grúas) son parte del parque de equipos de IMI.

VOPAK – Panama Terminal Expansion – Marine Works BLM1A

MPSA – Jetty Facility

MIT – Berth 8

MPSA – Intake Concrete Caisson

MENU