Archives

Author Archive

RITA

Posted on: August 16th, 2024 by 4ewebmaster

Seguridad, Salud Ocupacional y Medio Ambiente (SSOMA):

Posted on: July 11th, 2024 by 4ewebmaster

Safety, Health and Environment: Comprehensive talks and training on occupational safety and worker wellbeing. First aid training, fire drills, proper use of fire extinguishers, etc.

HAINA INTERNATIONAL TERMINALS – Port of Haina, East and West Breakwater Retaining Wall

Posted on: June 20th, 2024 by 4ewebmaster

The project consisted of driving 250 m of combiwall system for the protection of the existing breakwater to allow dredging to
increase the draft capacity of the navigation channel of the container and bulk port terminal located in Río Haina, Santo Domingo, Dominican Republic.

AES ANDRES DR – Supply, fabrication and Installation to reinforce the mooring dolphins and replace all quick release hooks (QRH).

Posted on: June 20th, 2024 by 4ewebmaster

Supply of materials, equipment and labor for the reinforcement of 6 mooring dolphins and the installation of 10 new quick release hooks (QRH) for the AES ANDRES LNG terminal, located in Santo Domingo, Dominican Republic.

ENERGÍA 2000 – Provisional trestle

Posted on: June 19th, 2024 by 4ewebmaster

Design and construction of a provisional trestle to be used in the construction of the permanent trestle for the reception of Natural Gas, and which also fulfills the function of a logistical unloading dock for heavy and oversized cargo for a 400 MW power plant in Dominican Republic.

MAMMOET LIFTING AND TRANSPORT Transportation of engines

Posted on: June 19th, 2024 by 4ewebmaster

The project consisted of the transportation of three engines from Puerto Cortes, Honduras to a nearby jetty.

For this project, IMI used a tugboat and barge to transport three 325 ton engines from the port at Puerto Cortes to a jetty located 2.5 km from the port. The engines were loaded onto the barge directly from the vessel carrying them and were unloaded via a roll-off operation.

ENERGÍA 2000 – Heavy and oversized unloading logistics service

Posted on: June 19th, 2024 by 4ewebmaster

Logistics services for the unloading of heavy and oversized equipment for the construction of the 400 MW Manzanillo Power Land thermoelectric plant in the Dominican Republic.

VOPAK – Jetty Shoreline Protection Work I & II

Posted on: June 19th, 2024 by 4ewebmaster

This project consisted of the installation of coastal protection on the east side of the Terminal, between the pier
and the construction of the new north Jetty (executed by IMI). The works consisted of excavation works, the supply, transport and the installation of geotextile and armor rock. This required high quality rock material trans-ferred from quarries on the Pacific coast to the Atlantic coast , city of Colón, Republic of Panama.

PPC – Improvement of the Mechanically Stabilized Earth (MSE) Wall and Pavement around the Perimeter of the Container Yard On La Mole – Phase 1

Posted on: June 19th, 2024 by 4ewebmaster

Panama Port Company. The project is located at the existing container port terminal at Port of Cristóbal in the City of Colón, Colón Province, Republic of Panama and consists of improvements to the mechanically stabilized earth (MSE) wall and adjacent road on the north side of “La Mole”.

VOPAK PANAMA ATLANTIC – Vopak New Hose Tower and Pipeline Replacement

Posted on: June 19th, 2024 by 4ewebmaster

EPC for the replacement of the Hose Tower located on the platform of the south pier in Terminal de Bahía Las Minas, Colón Panama, which
serves the terminal for the unloading of fuels from ships of up to 75,000DWT, storage and transfer to other ships. The dismantling of the existing tower and the assembly of the new tower was carried out with maritime equipment.

IMI | Intercoastal Marine Inc.